PO Box 887   •   Elk Rapids, MI  49629   •   Email Us

UPDATE: Journey to a Greater Beach

(0 comments)

UPDATE:  Journey to a Greater Beach This is the third report on the quest to stabilize a beach along the GT Bayshore.  A breakwater just offshore was installed  August 30, 2020.  The beach has grown to ever greater dimensions through three seasons.  Other residents alongshore have either built, planned, or expressed support for this solution. We’ll see what seasonal water level rise brings in the July-August peak. Read more 2021 Spring TNN News

Comments

There are currently no comments

New Comment

required

required (not published)

optional

required

required